Recent Projects

Wasatch High School

Contract Amount:  $10,800,000
June 2007 to June 2009
 
Construction of a new 300,000 square foot high school in Heber City, Utah.  HVAC work includes three (3) 300-ton chillers, six (6) 3,000,000 btu boilers, fourteen (14) custom-built air handling units with associated VAV boxes, controls and hydronic piping.  Plumbing work includes domestic water, waste and vent piping, roof drain piping, acid waste piping and compressed air piping.  Work also includes installation of all kitchen and restroom equipment.

Hill Air Force Base – North Plating Shop

Contract Amount: $8,700,000
September 2004 to December 2007
 
Design/Build Plating Shop remodel.  This work includes the replacement of the cadmium and chrome lines.  Work also includes installation of three (3) large ovens, forty-nine (49) tanks, steam, gas, reverse osmosis, air and acid waste piping.  Integration of new Allen Bradley control system with existing building systems, tanks, overhead crane and new scrubbers with PVC ductwork. 
 

Sunrise at Escala

Contract Amount:      $7,100,000
September 2007 to July 2009
  
Construction of a new 4-story, 90 unit condominium complex with underground parking. HVAC consists of installation of one (1) cooling tower, one (1) chiller and two (2) boilers supplying 272 fan coil units. Snowmelt system includes two (2) boilers and 25,000 square feet of underground piping. Plumbing includes waste, vent, domestic water and roof drains.

Utah Transit Authority–Warm Springs Facility

Contract Amount:      $3,500,000
March 2006 to January 2008 
 
Performance of miscellaneous upgrade work to retrofit existing warehouse space into full functioning maintenance facility. This work includes design-build vehicle exhaust system, warehouse heating system and office build-out. Work consists of gas piping, steam piping, equipment installation, electrical and various other build-out tasks.

 

IMC – Women’s & Newborns / Outpatient Care

Contract Amount:      $2,600,000
June 2006 to October 2006
 
Six floor tenant finish at the new IHC Hospital at 5400 South State. HVAC work includes installation of 137 VAV boxes with associated controls and hydronic piping. Plumbing work includes waste and vent piping, medical gas piping and installation of 200 sinks and 100 toilets.

 

City Creek Tower 5

Contract Amount:      $2,400,000
April 2009 – December 2009
 
Complete core and shell HVAC and plumbing complete with DDC control system. Complete layout of floor penetrations and imbeds for hangers and seismic bracing for complete HVAC and plumbing system.

 

Walker Center Renovation

Contract Amount:      $2,047,000
October 2006 to July 2007
 
Design-assisted project for the complete renovation of all mechanical and plumbing systems throughout the 17-story building. Mechanical work consisted of one (1) new chiller, four (4) boilers, associated fan-coil units and ductwork and complete new DDC control system. Plumbing work includes new restrooms throughout building.

 

Auto Owners Insurance

Contract Amount:      $1,500,000
February 2009 – July 2009
 
Complete plan spec HVAC and plumbing project. Snow melt, boilers, chillers, seismic engineering and bracing, DDC control system. Air handler and VAV system.

 

Silver Baron Lodge – Deer Valley

Contract Amount:      $1,400,000
January 2007 to October 2007
 
Construction of new 5-story building with 25 high-end condo units. Mechanical work includes installation of four-pipe heating and air-conditioning system, boiler installation, parking garage snowmelt system and installation of all plumbing fixtures.

 

Fashion Place – Murray

Contract Amount:      $1,250,000
May 2007 to October 2008                            
 
Demolition of plumbing of HVAC systems for preparation of added tenant space. Relocation of site utilities to allow for new buildings. Complete plumbing and HVAC systems on new buildings. Remodeled existing facility.