Recent Projects
Wasatch High School
Contract Amount: $10,800,000
June 2007 to June 2009
Construction of a new 300,000 square foot high school in Heber City, Utah. HVAC work includes three (3) 300-ton chillers, six (6) 3,000,000 btu boilers, fourteen (14) custom-built air handling units with associated VAV boxes, controls and hydronic piping. Plumbing work includes domestic water, waste and vent piping, roof drain piping, acid waste piping and compressed air piping. Work also includes installation of all kitchen and restroom equipment.
Hill Air Force Base – North Plating Shop
Contract Amount: $8,700,000
September 2004 to December 2007
Design/Build Plating Shop remodel. This work includes the replacement of the cadmium and chrome lines. Work also includes installation of three (3) large ovens, forty-nine (49) tanks, steam, gas, reverse osmosis, air and acid waste piping. Integration of new Allen Bradley control system with existing building systems, tanks, overhead crane and new scrubbers with PVC ductwork.
Sunrise at Escala
Utah Transit Authority–Warm Springs Facility
IMC – Women’s & Newborns / Outpatient Care
City Creek Tower 5
Walker Center Renovation
Auto Owners Insurance
Silver Baron Lodge – Deer Valley
Fashion Place – Murray